← Back to Daily
Daily / 2026-11-05

PLC product material and explicit SMS confirmation

PLC I/OProduct pagesAI confirmation

Observed work

Ad spend and search terms were examined with a request to resolve ambiguous intent against product evidence rather than reuse an old sample count. A PC-only change could not proceed because the device table failed to load. Earlier exact-negative additions appeared in evening status; a new request after login had no captured result. No inquiry recovery or advertising improvement was established.

Photoshop work organized Y305 images, layers and composites, producing several exports. Enlarged generated images were manually cleaned and saved. One malformed dimension/export attempt ended without success before force quit. Another request to replace alarm-document images had no captured final publication.

Catalog work covered Y305-4400, Y305-4421, Y305-8800, Y305-8821, Y305-EE00, Y305-EE21, Y305-JJ00 and Y305-JJ21, including prices, weights, interfaces and shared-image rules. laan specified RTC across the family. Updated specification/use/purchasing documents, focused tests and a documentation build were reported. Actual supplied configuration and power-loss retention/recovery still needed manufacturer or hardware checks. Business-tool prices were read back; some weight discrepancies remained.

All eight Y305 products first appeared as drafts; laan then approved publication. A later report of one public page was insufficient to accept every model’s storefront, checkout or indexing. Product-page direction used equipment sequencing, with level/pump examples for analog models and a comparison-oriented entry point.

Four Y301 products were reportedly separated and active, with old paired products archived. Y301-222 and Y301-444 analog choices were corrected to 0–10 V and 4–20 mA, removing unsupported 0–5 V, with specification/store synchronization reported. Draft URLs and redirects were revised; shared groups still had to align across store and English-site grouping, old links and theme references.

English product-detail links and sampled old routes passed reported checks. Main push, production deployment, redirects and sitemap submission/readback were reported successful. This did not prove every new product indexed, and unrelated failures remained in broad checks. SEO rules gained keyword-source, intent-grouping, existing-page and page-selection guidance with a reported commit/push.

Common UMS, mini-program and App notifications were discussed around authenticated HTTP retrieval. AI recommendation SMS would open a one-time confirmation page: merely opening it must not execute a device action; explicit acceptance or ignoring is required. Template configuration and backend tests were reported, while real receipt, phone-link behavior and test-device acceptance/ignore outcomes were still unknown.

The SMS confirmation page adopted a dark UI, organization identity, an optional project image and an orange primary action. Implementation began without final page acceptance. Backend/frontend development branches were reportedly pushed and synchronized, but production did not change. Migration, paired deployment and real-device checks remained separate.

A landscape film-PDF compilation with drawings and quantities on separate rows was requested. File/image processing had no final combined artifact or physical-print result. Viewing an inventory sheet did not establish an inventory change.

Corrections

2026-11-07 · Added confirmed product names, model references and official pages under the updated product-reference rules. Earlier outcomes and unresolved checks are unchanged.