← Back to Weekly
Weekly / 2026-10-19 — 2026-10-25

A week of releases and recovery checks

Weekly reviewApplication releasesPlatform checks

Observed work

Work on 19 October brought a round of wireless I/O PDF exports, common manual structures and specification corrections. An old diagram still carried a stale label. Wiring guides, websites, social materials and labels remained under review. The small standalone platform moved from a narrower scope into gateway and frontend work; passing gateway tests and a frontend build did not settle the full test suite or end-to-end delivery. Remote Windows optimization also lacked a confirmed result.

The product material covered MiniLink, the common Y301-220/222/440/444/880 manual, YenGear Toolbox, the online serial monitor and the cloud App. Each build, package, upload and distribution report has its own verification limit.

On 20 October, an industrial screen restarted into the App after its default launcher was configured. Further work addressed point-card layout, display options and saving. LoRa/Modbus diagrams, illustrated case material and MQTT v2 interfaces also advanced. Local tests and a gateway push were reported; final migrations, deployment and hardware rechecks were still open. Evening commit and push actions for threshold interaction and site workflows lacked independent remote readback.

The 22 October work included service packaging recovery, broker migration and connection repair, database indexes, TradeTool D1 rebuilding and export fixes. Production recovery and faster queries or exports were reported. Device control, post-restart checks, real inquiry data and browser file persistence were not all verified.

Mini-program schedules, linkage rules, project membership, model labels, serial diagnosis and iOS release preparation occupied 23 October. There were passing tests, builds and local migration checks alongside remaining API and build errors. Stable device communication and final store submission were not established that day.

On 24 October, recompilation and cache clearing enabled continuous live telemetry. Mini-program 2.1.0 uploaded successfully, while a later mini-program upload had no captured receipt. An iOS 20103 review submission was reported. Shared manuals, cloud configuration and published App landing pages also advanced; real control, iPhone authorization and final review outcomes remained separate checks.

The 25 October work concentrated on a dense bilingual serial-monitor layout and a local Toolbox 2.8.25 installer and update manifest. Focused tests passed, but complete site verification, upload and Windows upgrade testing were unfinished. A check reported iOS 20103 ready for distribution; Android build/update work had only begun. Website cleanup and advertising settings were also reviewed.

Corrections

2026-10-22 · Included evening 20 October commit/push activity found in later summaries. A returned window or immediate-push choice is not independent remote, production or hardware verification.

2026-11-07 · Added confirmed product names, model references and official pages under the updated product-reference rules. Earlier outcomes and unresolved checks are unchanged.