THINGS / Continuing work

Some work takes time
before its shape becomes clear.

These timelines follow work with a continuing story. A single action does not automatically need a timeline, and a gap in the record does not mean the work has ended.

Last entry · 2026-11-1213 updates

Project AI advisor: investigation and authorized actions

Follow project data investigation, point permissions and recommendations through cross-client/SMS confirmation, paired releases and real use. Design, tests, branch pushes and production/device execution remain distinct.

Last entry · 2026-11-102 updates

Industrial-screen layout and settings

Check point layout, preview/device agreement, time/project-code switches and group saving on the existing platform, distinguishing local tests, migrations, production and hardware behavior.

Last entry · 2026-11-091 updates

Model-specific alarm control and readback

Track Y811/Y812 alarm commands, capability limits and state readback for complete model configurations, with matched module data, gateway versions and real-device acceptance. Keep documentation, displayed state, simulation and field results distinct.

Last entry · 2026-11-082 updates

Silverdar passthrough and local I/O integration

Check Silverdar Modbus passthrough, local analog/digital reads, old-point handling and frame compatibility, distinguishing documentation, tests, deployed versions and real-device integration.

Last entry · 2026-11-022 updates

Modbus point-ID migration compatibility

Follow type-specific point identity, old-reference compatibility, existing-data rewriting and gateway reads across design, tests, commits, releases and actual devices.

Last entry · 2026-10-271 updates

Android packages and update entry points

Check agreement among UMSApp Android packages, release metadata, download buttons and QR codes, then installation/upgrading on real Android hardware. Local builds and online-file checks remain separate.

Last entry · 2026-10-253 updates

UMS 2.1.0 iOS release

Track this iOS version through resource builds, valid signing, packaging, store material, upload and review, retaining the verification boundary of each stage.

Last entry · 2026-10-243 updates

Messaging recovery through to device control

Check whether UMS and App clients resubscribe and complete control/state readback after broker changes, foreground reconnection and offline recovery. Server traffic, handshakes and tests do not by themselves prove that loop.

Last entry · 2026-10-202 updates

Minimum delivery of the standalone IoT platform

Follow the small standalone platform through scope decisions, gateway support, isolated frontend work and complete delivery checks, with design and partial tests separate from deployed results.

Last entry · 2026-10-181 updates

Checking the greenhouse video’s public release

Track public playback and end-screen checks for this greenhouse-case video, distinguishing production, upload, platform status and accessible public playback.

Last entry · 2026-10-121 updates

Y406 configurator: real-device read/write checks

Follow configuration reads, saving and recovery between the remote configurator and actual Bluetooth hardware, keeping software tests distinct from reproducible device results.